Municipality of Grävenwiesbach / Hochtaunus - 2022
Planning: Municipal drinking water supply
Test drilling before installing a well to secure the municipality's drinking water supply
Drilling point located approx. 40 meters from the elevated tank.
The geologists responsible believed that no water-bearing structures were to be found in this region of the Hochtaunus district.
Result:
The predicted water-bearing structure was precisely encountered.
Due to the core drilling method used, the drill core also provided clear evidence of the presence of tectonics.
Capacity: 72,000 liters/day
Eschbachhof - dairy farm Betz GbR, Ulrichstein / Vogelsberg - 2022
Planning: Agricultural service water supply
Construction of a well to secure the farm's water supply in Ulrichstein, the highest town in Hesse.
Drilling point located in close proximity below 20 meters to two dry wells
Result:
The water-bearing tectonics were encountered in the very limited area. The desired water supply of 120,000 l / day was exceeded.
Municipality of Ulrichstein / Vogelsberg - 2020
Planning: Municipal drinking water supply
Construction of a well to secure the drinking water supply for the town of Ulrichstein, the highest town in Hesse.
The drilling point was located just 50 meters from the elevated tank.
Result:
The tectonics were encountered precisely at the predicted depth.
The flow rate is over 350,000 l / day and has also been constant in the past dry summers.
Saudi Arabia / Khulais - 2018
Planning: Well for industrial water supply
Installation of a well to secure the company water supply
Drilling point located in the direct vicinity of the company in the Arabian stone desert.
The water supply is 500,000 liters per day.
India / Rajasthan province / Tonk district - 2017
Planning: Drinking water supply
Construction of a well to secure the water supply
Drilling point located in the immediate vicinity of the plant in the semi-desert of Rajasthan.
The water supply is over 100,000 liters per day.
Municipality of Perlesreut / Lower Bavaria - 2016
Planning: Municipal drinking water supply
Installation of a well to secure the community's drinking water supply.
Drill point located in the middle of four previously drilled failed holes without our process.
Distance to the next drilling site approx. 28 meters.
Result:
The tectonics were encountered at the predicted depth.
The flow rate is 170,000 l / day and has also been constant in the past dry summers.
Municipality of Philippsreut / Lower Bavaria - 2015
Planning: Municipal drinking water supply
Installation of a well to secure the community's drinking water supply
Drill point located in the middle of four previously drilled failed holes without our process.
Distance to the next drilling site approx. 42 meters.
Result:
The tectonics were encountered at the predicted depth.
The flow rate is 200,000 l / day and has also been constant in the past dry summers.
Further press articles:
https://www.giessener-allgemeine.de/vogelsbergkreis/endlich-genug-wasser-fuer-alle-90850574.html
http://www.sueddeutsche.de/bayern/mitterfirmiansreut-neue-quelle-beendet-wasserknappheit-1.2758066
http://www.sueddeutsche.de/bayern/mitterfirmiansreut-wenn-duschen-zum-luxus-wird-1.2735534